-
Digging the hole for the water storage tanks and pump.
-
Digging the river.
-
Digging the river at the bend.
-
Pond liner and underlayment is installed and Tank and pump are in the ground.
-
Start of rock laying.
-
Another view.
-
Rocks moved closer to river.
-
Tunnel under the river for a dedicated track loop indepenent of the main track plan.
-
Pipe installed.
-
Upper river liner and underlayment installed.
-
Liner at the waterfall.
-
Liner under railroad bridge. There will be a waterfall.
-
Liner joint.
-
Back view of the waterfall. You can see the tunnel portal.
-
Bolders around the water fall. Need tobuy addiation bouldersto finish.