• Digging the hole for the water storage tanks and pump.





  • Digging the river.





  • Digging the river at the bend.





  • Pond liner and underlayment is installed and Tank and pump are in the ground.





  • Start of rock laying.





  • Another view.





  • Rocks moved closer to river.



  • Tunnel under the river for a dedicated track loop indepenent of the main track plan.




  • Pipe installed.




  • Upper river liner and underlayment installed.




  • Liner at the waterfall.




  • Liner under railroad bridge. There will be a waterfall.




  • Liner joint.




  • Back view of the waterfall. You can see the tunnel portal.




  • Bolders around the water fall. Need tobuy addiation bouldersto finish.